During the period of 2000-2001, the total production
was being examined and in sum of 83566 packaging,
it came up the average of the quantitative fixture
of cotton ginning that we have for disposal and
which is: |
| Mic |
4,1
|
| Rd |
70,9
|
| ( +b ) |
8,6
|
| Length |
28,5
|
| Unif |
83
|
| SFI |
5,3
|
| Elong |
8,3
|
| Strength |
30,1
|
| TrCode |
2
|
| TrCount |
19
|
| TrArea |
0,3
|
The company supplies cottonseed, which is being elaborated
to subtract the pedicles and the waste, for the final
demarcation in: cotton ginning and cottonseed.
The productive procedure starts with the feeding of
the ginning with cottonseed , which previously may have
enter the draught procedure.
Through the supplier stripe, the cotton is brought on
and then loads the feeder of ginning machine. In there
it performs the first stage of the drought procedure
with the help of the warm air.
Afterwards, goes to the cleaning line in which we take
off the pedicles and follows the second stage of drought.
When the procedure is completed, the cottonseed is being
cleaned from the begging in the ginning machine, where
it distinguishes, in clean cotton and in cottonseed.
After the procedure of ginning the cotton that emerges,
free from seed, go to the final cleaning for the take
off of the last waste and then is being drove to the
press for packaging and storing.
|